October 2008 Construction Updates

The bathtubs for the first three floors have arrived.

Image
2

We have commenced the installation of our triple pane, low-E windows.

Image
3

The drywall ceiling is in place and soon the steel stud partitions will be as well.

Image
4

Early morning at The Renaissance, two pump trucks are preparing to pour. Today’s mission is the North half of the fifth floor slab and the South half of the fourth floor walls.